Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Intermot-IVM Design Award Competition 2004

Fri, 21 May 2004

A perception that young people are less and less attracted to motorbikes provides the theme for the first Intermot-IVM Design Award competition. The Motorcycle Industry Association of Germany (IVM e.V.) and the Trade Fair Munich/Intermot have decided to intensively take care of their young clients with several activities this year. As young people are no longer inspired by superb technology alone, but are impressed more and more visually, it is only logical to place a greater emphasis on the design of the bike in winning over young customers.

Hyundai i10 Electric introduced

Fri, 04 Sep 2009

The all electric Hyundai i10 will show at Frankfurt (click for bigger image) This is a bit of a surprise from Hyundai, as they’d always said they would concentrate on hybrids until hydrogen fuel cell technology was advanced enough to make it viable in a budget car. But Hyundai are being pragmatic. There is a desire from the public for all electric cars – however misplaced that may be – and Hyundai aren’t going to be left out.

July 9: Keeping it topped off

Fri, 09 Jul 2010

As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.